Dredger Nile River will arrive at the site of the new Suez Canal project on Monday, said executive director of the dredging works at the project Wagdi Zaki.
The dredger, owned by an American-Belgian consortium, is coming from Turkey, he added.
The new arrival brings to 35 the number of dredgers operating in the project, of which five are owned by the Suez Canal Authority, he said.
So far, they managed to lift 115.13 billion cubic meters of water-filled sand out of the set target of 250 billion cubic meters.
The new project will expand the existing Suez Canal linking the Mediterranean and the Red Sea.
The enlarged canal will allow ships to sail in both directions at the same time over much of the canal's length. This is expected to decrease waiting hours from 11 to 3 hours for most ships and to double the capacity of the Suez Canal from 49 to 97 ships a day.
GMT 00:37 2018 Wednesday ,24 January
Bitcoin slumps below $10,000GMT 22:49 2018 Tuesday ,23 January
Sharjah apartment rents see steep decline in 2017GMT 19:15 2018 Tuesday ,23 January
Emirati fined Dh2.2m for embezzling public fundsGMT 22:27 2018 Monday ,22 January
Jafza bridge benefits trade, logistics supply chainGMT 22:21 2018 Monday ,22 January
Damac chairman to speak on digital skillsGMT 10:55 2018 Monday ,22 January
Bahrain-Indian economic ties discussedGMT 22:42 2018 Saturday ,20 January
'Massive' infrastructure spending needed in AfricaGMT 12:49 2018 Tuesday ,16 January
Tabarak Buys Majority Stake in a Private CompanyMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor