London’s iconic Tower Bridge closed to vehicles for three months on Saturday for its first major maintenance works in nearly half a century.
The 122-year-old drawbridge by the Tower of London — whose roadway leaves are lifted to allow tall ships on the River Thames to pass through — carries 21,000 vehicles and some 40,000 people per day.
“This heavy use has had an effect on timber decking of the bridge, which was last refurbished in 1970,” said a statement from the City of London Corporation, which owns the Victorian Gothic landmark.
“To ensure that the bridge continues to serve as a vital river crossing we need to undertake the essential maintenance works.”
It will be closed to road traffic until Dec. 30. The bridge’s leaves will continue to operate as normal for river traffic. It lifts on average 800 to 900 times a year, a major tourist attraction that can be viewed from a glass walkway above.
The bridge’s galleries will remain open during the works, and pedestrians will still be able to pass with the exception of three weekends in November and December.
The bridge is 801 feet (244 meters) long and 213 feet (65 meters) high.
The maintenance includes major work to the bridge lifting mechanisms, replacing the timber decking, resurfacing the road and walkways, and waterproofing the brick arches.
Source : Arab News
GMT 21:59 2018 Monday ,22 January
Honduras roads blocked in protestsGMT 10:39 2018 Friday ,19 January
France and Germany to propose bitcoin regulationsGMT 11:01 2018 Thursday ,18 January
Iran says Trump has thrown Airbus deals into doubtGMT 09:11 2018 Thursday ,11 January
China orders 184 Airbus A320 planes: FranceGMT 09:58 2017 Saturday ,30 December
Ireland issues record number of passports amid BrexitMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor