The National Iranian Oil Company (NIOC) on Tuesday reported that the company\'s contractors have hit a new record for designing, building, installing and launching the jacket of the South Pars phase 19 platform. The report said that despite international sanctions against Iran\'s oil and gas industry, the jacket has been built and installed in the Persian Gulf waters in nine days, which is the shortest time recorded for installing offshore jackets. The company announced that the record was unprecedented in the 103-year history of Iran\'s oil industry. Meantime, the NIOC on Sunday started developing Forouzan oil field. The operation began by sending the first jacket related to the development of Forouzan oil field to the Persian Gulf. The huge structure made by a special jacket manufacturing yard in Iran\'s Southwestern port city of Khorramshahr, weighs about 4,000 tons and is carried by a special vessel. If climatic conditions are good, it will be installed by late May. The second jacket related to the Forouzan oil field development project will be sent to the offshore field within the next few weeks.
GMT 22:17 2018 Monday ,22 January
Opec output cuts near victoryGMT 22:57 2018 Saturday ,20 January
the literary canary in India's coalmineGMT 07:11 2018 Friday ,19 January
Oil market heads towards 'smooth rebalancing': OPECGMT 19:07 2018 Saturday ,13 January
Oil hits $70 a barrel for the first time in three yearsGMT 19:07 2018 Saturday ,13 January
Oil hits $70 a barrel for the first time in three yearsGMT 15:44 2018 Saturday ,13 January
Bahrain to host MERTC 2018GMT 18:24 2018 Friday ,12 January
No need to panic over $70 oil price: UAE Energy MinisterGMT 13:21 2018 Friday ,12 January
Kuwaiti oil price up 93 cents to stand at US$66.09 per barrelMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor