Prime Minister Abdelmalek Sellal has inaugurated Monday in Bethioua, a new production plant of Liquefied Natural Gas (Train LNG 3), in the industrial zone of petrochemistry of Arzew (Oran).
Alternate to the complex (GL4/Z called "La Camel", the world’s first LNG plant closed in 2010 after 46 years of activity, this new industrial plant, built on land base of 54 hectares should contribute to the development of the capacity of the national production of the natural liquefied gas.
This plant has a production capacity of 4.7 million metric tonnes of LNG, 58,000 tonnes of butane, 275,000 tonnes of propane gas, 300,000 tonnes of ethane, 47,000 tonnes of de gasoline and 115.5 normal cubic meters (Nm3) of helium-enriched gas.
On the social plan, this investment, funded by Sonatrach for $4 billion, i.e. DZD304 billion plans the creation of 645 direct jobs and 250 indirect ones.
The Prime Minister’s visit to Oran coincided with the loading of a LNG carrier with a capacity of 125,000 tonnes.
GMT 09:26 2018 Tuesday ,23 January
France says it fell short on greenhouse gas emissionsGMT 08:25 2018 Saturday ,20 January
Greenpeace activists face fine over Eiffel Tower protestGMT 04:38 2018 Saturday ,20 January
US to overtake Saudi as crude oil producer: IEAGMT 10:43 2018 Friday ,19 January
TransCanada secures contracts to move forward with Keystone constructionGMT 08:54 2018 Thursday ,18 January
Norway aims for all short-haul flights 100% electric by 2040GMT 15:12 2018 Wednesday ,17 January
BP hit by new $1.7bn Gulf oil spill chargeGMT 16:31 2018 Monday ,15 January
Two schools could win Dh1m of solar panels in Sustainability Champions competitionGMT 03:08 2018 Monday ,15 January
Danish wind power whips up record 43% of electricityMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor