The Ministry of Works, Municipalities & Urban Planning Assistant Undersecretary for Sanitary said the Ministry has achieved 38% progress in the urgent works for the supply of pumping and lifting stations. The project is part of the Ministry’s plan aiming to reduce sewerage networks defects. ]
Works involved in the project consist of surveying 71 lifting and pumping stations, supplying and replacing some pumps and control panels and carrying out some improvements related to electromechanical works. Lifting pumps for 64 stations have been purchased, and work is underway to replace 37 control panels with new ones and fix 33 other control panels. Also, stations locations have already been examined.
The Under – secretary stated that 11 stations have been supplied and installed; A2F in Block 325 in Al Fadhel Area, A2H in Block 303 in Abu Seera Area, A5J in Block 339 in Umm Al Hassam, B17 in Block 233 in Dair, C5B in Block 368 in Janabiya, E2E in Block 1032 in Malkiya, E2F in Block 1032 also in Malkiya, E8E in Block 840 in Isa Town, E11D in Block 910 in West Riffa, G8 in Block 604 in Quraya and X01A in Block 1001 in Jasra. Tests revealed that all stations are operating well. Currently, pumps are being installed in C4C station located in Block 404 in Sanabis.
The BD1,297,650.000 project commenced in October last year and was awarded to Zohal Constructions.
GMT 09:26 2018 Tuesday ,23 January
France says it fell short on greenhouse gas emissionsGMT 08:25 2018 Saturday ,20 January
Greenpeace activists face fine over Eiffel Tower protestGMT 04:38 2018 Saturday ,20 January
US to overtake Saudi as crude oil producer: IEAGMT 10:43 2018 Friday ,19 January
TransCanada secures contracts to move forward with Keystone constructionGMT 08:54 2018 Thursday ,18 January
Norway aims for all short-haul flights 100% electric by 2040GMT 15:12 2018 Wednesday ,17 January
BP hit by new $1.7bn Gulf oil spill chargeGMT 16:31 2018 Monday ,15 January
Two schools could win Dh1m of solar panels in Sustainability Champions competitionGMT 03:08 2018 Monday ,15 January
Danish wind power whips up record 43% of electricityMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor