Water Resources and Irrigation Minister Hossm Al Moghazi and Aswan Governor Mostafa Youssri opened on Saturday the technical security systems of the High Dam after it has been developed at a total cost of EGP 3.5 million to fully secure the entrances and exits of the dam.
During his tour of the dam, the minister witnessed the operation of two irrigation gates which pump 40 million cubic meters daily.
In statements on Saturday, the minister said his tour of Aswan started with the inspection of the Egyptian-Russian Friendship Monument.
The minister also said he laid the foundation stone of a project to develop the farmland located behind the High Dam at an area of 7.5 feddans with a cost of EGP one million.
The minister also asserted that the River Nile in Aswan will be totally free from any pollutants by the end of June as part of a campaign launched by Prime Minister Ibrahim Mahlab to remove any transgressions on the Nile.
GMT 19:57 2018 Tuesday ,23 January
Farm-fresh from Kerala to the UAE, in just one dayGMT 15:20 2018 Sunday ,21 January
Littering with a cigarette stub can cost you Dh500 in DubaiGMT 16:19 2018 Friday ,12 January
Three earthquakes hit Iraqi-Iranian borderGMT 10:19 2018 Friday ,05 January
Hundreds of Gazans protest electricity cutsGMT 08:07 2017 Sunday ,24 December
Gaza zookeeper puts lion cubs up for saleGMT 19:05 2017 Tuesday ,28 November
UAE providing ideal environment for maritime multinationalsGMT 22:34 2017 Monday ,27 November
Lebanese ready to go to any depth to tackle garbage crisisGMT 18:04 2017 Sunday ,26 November
DEWA named main sponsor of Dubai Forum for GovernmentMaintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2021 ©
Send your comments
Your comment as a visitor